The employment of production control planners is expected to grow at an average rate over the next decade.ĭemand for these workers will stem from the need to improve productivity and efficiency in manufacturing firms. They may also earn additional compensation in the form of bonuses. Production control planners’ salaries vary depending on their level of education, years of experience, and the size and industry of the company. Production Control Planner Salary & Outlook Communicating with supervisors to respond to any issues that arise during production.Preparing reports on production control activities such as labor costs, overtime expenses, production statistics, and equipment breakdowns.Managing inventory levels to ensure that supply does not run out during production periods.Working with vendors to order parts for production as needed.Preparing shift schedules for production staff based on available labor pools and workload requirements.Developing or updating the production control plan, including work instruction manuals and standard operating procedures (SOPs).Monitoring production costs to ensure that they are within budget guidelines.Ensuring that production schedules are met by coordinating with engineering teams to resolve design issues or problems with materials.Coordinating with facilities managers to ensure that all production needs are met.Production control planners have a wide range of responsibilities, which can include: This might include ensuring that raw materials meet certain standards before they enter the production cycle or monitoring the progress of individual components as they move from one station to another. Production control planners may also help coordinate production schedules and monitor quality control throughout the manufacturing process. They work with suppliers, vendors, and other stakeholders to ensure that everything gets where it needs to be on time and in good condition. Make every future a success.Production control planners are responsible for planning and coordinating the flow of materials, parts, and products through a company’s supply chain. Knowledge of pharmaceutical principles and supply chain practices and software systems.Experience working in a GMP environment.ĮXPERIENCE: 2-4 years planning experience in a pharmaceutical operations environment. Bachelor of Science in Logistics, Business, Industrial Engineering or Operations Research preferred.We do not discriminate in recruitment, hiring, training, promotion or any other employment practices for reasons of race, color, religion, gender, national origin, age, sexual orientation, marital or veteran status, disability, or any other legally protected status. The Novartis Group of Companies are Equal Opportunity Employers and take pride in maintaining a diverse environment. Working knowledge of SAP and ability to learn cell chain software systems.Knowledge of Good Manufacturing Practices. Pharmaceutical Production – knowledge of pharmaceutical operations and industry practices.Supply Chain Principles – understanding of Materials Management principles such as (but not limited to) MPS, MRP, CRP, DRP, SFC, purchasing, distribution, import/export, transportation, etc.Determine and inform production priorities and overtime requirements.Participation on monthly Demand Management team.Establish optimum cycle to maximize flexibility, while minimizing WIP. Ensure transparency and priorities of orders.Ensures applicable coverage of materials to meet manufacturing and packing plans.Execution of Clinical Production Plan.Working under limited supervision, the Clinical Production Planning and Schedule Control Associate is responsible for developing and managing the execution of the supply plan based on agreed upon safety stock levels while optimizing clinical production operations.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |